未设置

Maintenance service

First class service, excellent quality

The main responsibilities of departments of maintenance service center as the company transformer taikai transformer maintenance work.

First class maintenance team, professional maintenance equipment

Taikai issued “container type power transformer comprehensive test car” and other high end service equipment, ensure the site acceptance test electrical performance test requirements.
Maintenance center has now undertake and complete a variety of conventional and special transformer site and return to plant maintenance work, including: ZHSFPTB-100000/220 the whole flow, DFP-210000/500 single phase transformation, 24000/35 HJSSPZ- electric furnace, SFZ10-80000/220 power, SFZ11-63000/110 power change, etc.,

Business scope covers the North China, central China, radiation northwest, southwest, northeast and other regions. At present, the maintenance center relying on the company’s technological resource superiority, develop and “integrity, pragmatic, innovative” spirit of enterprise, active for the user to solve problems and provide technical support and services.
The building blocks in order to guarantee the stable operation of the power sector and production enterprises, production safety, escort!

Maintenance service hotline:0538-8931676

Fax:0538-8931679

Download

Service scope of maintenance service center

Field maintenance Hanging cover, hanging core overhaul
Technical transformation of the counter measures
Pressure regulating switch maintenance and replacement switch indoor oil
Air cooling system modification (adding fan, chip, self cooling and cooling)
Oil storage tank renovation and upgrading (replacement capsule, replacement of metal corrugated oil tank)
Replace sealing gasket
To eliminate the shortage, to deal with the leakage of oil
Replace component (chip, casing, instrument, control cabinet)
Oil work (oil filter, oil supplement)
Transformer antiseptic treatment (derusting and painting)
Preventive test (routine spring and autumn inspection)
Acceptance test (including pressure, PD)
Removing and installing
Transformer displacement (shift, transport)
On-site technical support (guidance overhaul, repair)
Return to plant maintenance Back to the factory routine inspection
Accident repair, replace the coil, the body
Transformer voltage level transformation
Transformer capacity reduction capacity transformation
Voltage regulating switch
Cooling system modification (self cooling, air cooling and self cooling)
Other transformation
Buy all kinds of accessories Transformer, oil seal, moisture absorber, temperature control meter, pressure release valve, an oil level meter, electric mechanism, a switch controller, a cable, a fan, San, storage cabinets, all kinds of valves, equipment line clamp, etc.
New product development Comprehensive test vehicle for power transformer