未设置

CEC: Thirteen five period will actively promote the reform o

Electric power enterprises in China Federation of the Sixth National Congress of the members of the and the sixth session of the Council for the first time meeting held today in Beijing. Electric executive vice president of the association of the Fifth Council of the long sun Yucai said. “45 period and in electrical contact should be in under the guidance of” open, relatively independent, three strengthen “the electric power system reform key point and path, and actively promote the reform of the electricity market.
According to the requirements of the deployment of the central power system reform document No. 9 and has released six new supporting reform document, “45” period, China’s electric power system will occur significant changes. Sun Yucai pointed out that electric couplet should actively participate in the reform of electric power system, thorough investigation of enterprise in the promotion of reform and difficulty and problem, put forward reform suggestions, in-depth understanding of the power grid, power generation, distribution and sale of electricity enterprises in the reform of the common requirements, the research industry self-discipline mechanism; in authorized by the government or under the guidance, perfecting the construction of industry credit information platform and the system and mechanism.
Eighth session of Fifth Plenary Session proposed to accelerate the development of wind energy, solar energy, biomass energy, hydropower, geothermal energy, safe and efficient development of nuclear power, strengthen storage energy and smart grid construction, the development of distributed energy, the implementation of energy-saving low carbon power scheduling.
Sun Yucai suggested that the “Thirteen five” period, the CEC should actively participate in the power thirteen five plan to develop and research. According to the factory network construction is not harmonious, the power of relatively superfluous, abandoned abandoned wind water Qiguang, nuclear power and the construction of large hydropower stations, coal equipment blocked low utilization rate and energy saving transformation difficulty and depth of power equipment overcapacity and other difficult issues, in-depth research, put forward the planning and policy recommendations; according to the new requirement of the construction of ecological civilization, strengthen the research of coal, electricity and gas and non fossil energy sources, and clean energy and alternative energy research, promote the optimization of energy system in electric power as the center; according to the characteristics of Chinese unbalanced economic development, energy resources are not balanced, the environmental capacity is not balanced, further research on a wide range of energy resource allocation and optimization of the coordinated development of the distributed energy problem and promote the UHV power grid power grid construction and function.
Sun Yucai also suggested that the “Thirteen five” period, the CEC should be based on “The Belt and Road” strategy and the construction of global energy Internet initiative, actively promote the global energy development of the Internet, promoting the popularization and application of UHV, nuclear power, hydropower, renewable energy, clean coal power generation and other advanced technology and equipment in the world; actively assist electric power enterprises hold together the sea, through the orderly competition, investment, construction, operation and management of electric power project or other projects, and to share the results of the project host country; strengthen cooperation with international organizations, international organizations and relevant national power power industry cooperation, promote two-way exchange of technology, equipment, management, and actively promote the power management standards, international experience to promote the technological progress of world power.
Source: China electric power electrical network

 

RELATED POSTS